SCROLL

  • Place
    AOSTA (AO)
  • Execution period
    2022-2023

Construction of the steel arch to protect the A5 motorway in the Pont Suaz area (AO) at the Aosta-Pila cable car.
The structure replaces the old glulam structure dating back to the 1990s.

Our team took care of the workshop construction design and technical assistance during the welding and assembly of the curved segments in both directions, including the ground layouts.

Pila - Aosta motorway overpass
Pila - Aosta motorway overpass
Pila - Aosta motorway overpass